Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Textile Chemicals
NAICS
n/a
SIC 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 41,050
ft2
Annual Production 22,000
Tgal
Production Hrs. Annual 4,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,338 535,680
kWh
Electricity Demand $6,077 1,674
kW-mo/yr
Electricity Fees $3,551 -
Natural Gas $89,241 13,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $16,455 $5,110 $(-319.0)
(-12,800)
kWh
$(-664.0)
-
kW-mo/yr
$(-60.0) $17,498
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $851 $2,902 $430
17,288
kWh
$374
-
kW-mo/yr
$47 - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $351 $727 $122
4,906
kWh
$22
-
kW-mo/yr
$10 - - $197 -
04 3.4114: Replace city water with recycled water via cooling tower $6,753 $18,500 $(-1,670.0)
(-67,050)
kWh
- - - $6,659
-
Tgal
$(-1,300.0) $3,064
-
Tgal
05 2.2123: Insulate feedwater tank $153 $220 - - - $153
-
MMBtu
- - -
06 2.2511: Insulate bare equipment $2,786 $4,000 - - - $2,786
-
MMBtu
- - -
TOTAL RECOMMENDED $27,349 $31,459 $(-1,437.0)
(-57,656)
kWh
$(-268.0)
-
kW-mo/yr
$(-3.0) $20,437
-
MMBtu
$6,659
-
Tgal
$(-1,103.0) $3,064
-
Tgal
TOTAL IMPLEMENTED $17,459 $8,232 $111
4,488
kWh
$(-290.0)
-
kW-mo/yr
$(-13.0) $17,651
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs