Assessment Year | 2001 |
---|---|
Principal Product | Textile Chemicals |
NAICS |
n/a
|
SIC | 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
41,050
ft2
|
Annual Production | 22,000
Tgal
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $13,338 | 535,680 |
kWh
|
$0.025 |
Electricity Demand | $6,077 | 1,674 |
kW-mo/yr
|
$3.63 |
Electricity Fees | $3,551 | - |
|
- |
Natural Gas | $89,241 | 13,258 |
MMBtu
|
$6.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,349 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,459 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $16,455 | $5,110 |
$(-319.0)
(-12,800)
kWh
|
$(-664.0)
-
kW-mo/yr
|
$(-60.0) |
$17,498
-
MMBtu
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $851 | $2,902 |
$430
17,288
kWh
|
$374
-
kW-mo/yr
|
$47 | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $351 | $727 |
$122
4,906
kWh
|
$22
-
kW-mo/yr
|
$10 | - | - | $197 | - | |
04 | 3.4114: Replace city water with recycled water via cooling tower | $6,753 | $18,500 |
$(-1,670.0)
(-67,050)
kWh
|
- | - | - |
$6,659
-
Tgal
|
$(-1,300.0) |
$3,064
-
Tgal
|
|
05 | 2.2123: Insulate feedwater tank | $153 | $220 | - | - | - |
$153
-
MMBtu
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $2,786 | $4,000 | - | - | - |
$2,786
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $27,349 | $31,459 |
$(-1,437.0)
(-57,656)
kWh
|
$(-268.0)
-
kW-mo/yr
|
$(-3.0) |
$20,437
-
MMBtu
|
$6,659
-
Tgal
|
$(-1,103.0) |
$3,064
-
Tgal
|
||
TOTAL IMPLEMENTED | $17,459 | $8,232 |
$111
4,488
kWh
|
$(-290.0)
-
kW-mo/yr
|
$(-13.0) |
$17,651
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs