ITAC Assessment: NC0056
ITAC logo
ITAC Assessment: NC0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Precision Metering Pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 52,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,817 3,666,178
kWh
Natural Gas $413 62
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,849 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $168 $152 $168
3,224
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $2,092 $250 $2,092
39,566
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,032 $480 $3,032
57,151
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,969 $620 $3,969
75,029
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $1,813 $320 $1,813
32,532
kWh
- -
06 2.6231: Utilize controls to operate equipment only when needed $2,221 - $2,221
81,477
kWh
- -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,168 $4,000 $2,582
19,343
kWh
$(-414.0)
-
MMBtu
-
08 3.5316: Contract a wood pallet recycling company $200 $100 - - $200
-
lb
09 3.5313: Increase amount of waste recovered for resale $186 $100 - - $186
-
lb
TOTAL RECOMMENDED $15,849 $6,022 $15,877
308,322
kWh
$(-414.0)
-
MMBtu
$386
-
lb
TOTAL IMPLEMENTED $13,681 $2,022 $13,295
288,979
kWh
- $386
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs