ITAC Assessment: NC0037
ITAC logo
ITAC Assessment: NC0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Membrane roofing
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 237,000
ft2
Annual Production 10,000
thousand feet
Production Hrs. Annual 4,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $580,722 10,988,570
kWh
Natural Gas $84,069 30,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $494 $360 $494
9,379
kWh
-
02 2.4133: Use most efficient type of electric motors $13,656 $28,570 $13,656
257,620
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,535 $4,662 $1,535
29,015
kWh
-
04 2.1213: Direct warmest air to combustion intake $420 $300 - $420
-
MMBtu
05 2.2511: Insulate bare equipment $4,967 $536 - $4,967
-
MMBtu
TOTAL RECOMMENDED $21,072 $34,428 $15,685
296,014
kWh
$5,387
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs