ITAC Assessment: NC0036
ITAC logo
ITAC Assessment: NC0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Corrugated Packaging and Displays
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 209,440
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,202 5,204,279
kWh
Natural Gas $160,822 41,112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,746 $690 $3,746
70,633
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,746 $500 $1,746
32,825
kWh
-
03 2.3137: Use power during off-peak periods $6,360 $2,040 $6,360
-
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $12,033 $24,000 $(-596.0)
(-11,137)
kWh
$12,629
-
MMBtu
05 2.4133: Use most efficient type of electric motors $7,337 $12,750 $7,337
138,335
kWh
-
TOTAL RECOMMENDED $31,222 $39,980 $18,593
230,656
kWh
$12,629
-
MMBtu
TOTAL IMPLEMENTED $12,829 $13,940 $12,829
241,793
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs