ITAC Assessment: NC0031
ITAC logo
ITAC Assessment: NC0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Embroidery and Screenprint
NAICS
n/a
SIC 2397: Schiffli Machine Embroideries
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 116,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,864
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,825 1,245,018
kWh
Natural Gas $5,628 1,145
MMBtu
LPG $28,519 3,042
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,326

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,702 $390 $1,702
29,894
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $419 $250 $419
7,327
kWh
-
03 2.4226: Use / purchase optimum sized compressor $2,470 $520 $2,470
35,756
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $651 $831 $651
20,516
kWh
-
05 2.2511: Insulate bare equipment $554 $486 - $554
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,050 $10,000 $4,050
-
kWh
-
TOTAL RECOMMENDED $9,846 $12,477 $9,292
93,493
kWh
$554
-
MMBtu
TOTAL IMPLEMENTED $3,326 $1,957 $2,772
57,737
kWh
$554
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs