ITAC Assessment: NC0017
ITAC logo
ITAC Assessment: NC0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electromechanical Switches
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area 109,433
ft2
Annual Production 8,258,664
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $424,777 7,422,919
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,058 $3,076 $8,058
141,852
kWh
02 2.7124: Make a practice of turning off lights when not needed $5,343 - $5,343
93,787
kWh
03 2.4133: Use most efficient type of electric motors $8,354 $10,150 $8,354
146,542
kWh
04 2.2511: Insulate bare equipment $9,405 $3,536 $9,405
165,006
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,403 $1,230 $5,403
100,234
kWh
06 2.4221: Install compressor air intakes in coolest locations $1,366 $750 $1,366
24,033
kWh
07 2.7231: Use radiant heater for spot heating $12,784 $14,500 $12,784
225,967
kWh
TOTAL RECOMMENDED $50,713 $33,242 $50,713
897,421
kWh
TOTAL IMPLEMENTED $32,954 $19,556 $32,954
585,873
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs