ITAC Assessment: NC0007
ITAC logo
ITAC Assessment: NC0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 268
Plant Area 248,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,310
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,925 3,679,074
kWh
Natural Gas $1,292 125
MMBtu
Fuel Oil #2 $2,002 343
MMBtu
Other Energy $16,276 4,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,349

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Wood Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $16,854 $32,000 $16,854
172,333
kWh
- -
02 2.2437: Recover waste heat from equipment $3,805 $6,000 - $3,805
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $1,206 $1,590 $1,206
22,860
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $4,580 - $4,580
86,460
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $770 $450 $770
14,654
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,702 $10,980 $10,702
201,934
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,177 $2,106 $2,177
41,032
kWh
- -
08 2.1222: Install turbulators $8,700 $1,500 - - $8,700
-
MMBtu
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,500 $200 $4,500
-
kWh
- -
TOTAL RECOMMENDED $53,294 $54,826 $40,789
539,273
kWh
$3,805
-
MMBtu
$8,700
-
MMBtu
TOTAL IMPLEMENTED $22,349 $15,036 $13,649
257,620
kWh
- $8,700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs