ITAC Assessment: NC0006
ITAC logo
ITAC Assessment: NC0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Soaps/Detergents
NAICS
n/a
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 96,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,465 674,971
kWh
Natural Gas $54,713 11,023
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,616

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,007 $428 $1,007
14,947
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,007 $2,910 $1,007
14,947
kWh
03 2.6231: Utilize controls to operate equipment only when needed $4,860 $600 $4,860
72,685
kWh
04 2.4133: Use most efficient type of electric motors $3,688 $5,010 $3,688
55,100
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,245 $2,027 $1,245
18,464
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,061 $120 $5,061
75,615
kWh
07 2.4239: Eliminate or reduce compressed air usage $3,538 $6,000 $3,538
52,755
kWh
TOTAL RECOMMENDED $20,406 $17,095 $20,406
304,513
kWh
TOTAL IMPLEMENTED $14,616 $6,158 $14,616
218,347
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs