ITAC Assessment: NC0003
ITAC logo
ITAC Assessment: NC0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Automotive Steering Part
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 139,800
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,036 6,945,194
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,399

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7134: Use photocell controls $381 $159 $381
7,034
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $648 $360 $648
12,016
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,625 $300 $5,625
103,458
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,844 $1,000 $2,844
52,169
kWh
-
05 2.2437: Recover waste heat from equipment $6,594 $6,000 $6,594
322,098
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,205 $31,000 $18,605
342,028
kWh
$(-5,400.0)
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $307 $650 $307
5,569
kWh
-
TOTAL RECOMMENDED $29,604 $39,469 $35,004
844,372
kWh
$(-5,400.0)
-
MMBtu
TOTAL IMPLEMENTED $16,399 $8,469 $16,399
502,344
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs