ITAC Assessment: MZ0355
ITAC logo
ITAC Assessment: MZ0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product drawn wire
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $100
M
to 500
M
# of Employees 149
Plant Area 330,000
ft2
Annual Production 140,714
ton
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,988,745 27,990,800
kWh
Electricity Demand $647,925 74,664
kW-mo/yr
Natural Gas $1,940,353 469,012
MMBtu
Waste Disposal Costs
Water Usage $155,211 37,169
Tgal
Water Disposal $73,153 37,169
Tgal
TOTAL YEARLY COSTS $4,805,387
RECOMMENDED SAVINGS* $135,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $60,563 $285,000 $60,563
833,009
kWh
- -
02 2.7263: Lower compressor pressure through a/c system modification $9,825 $7,940 $9,825
138,378
kWh
- -
03 2.7135: Install occupancy sensors $860 $750 $860
12,110
kWh
- -
04 2.7232: Replace existing hvac unit with high efficiency model $17,125 $42,980 $12,828
180,675
kWh
$4,297
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $15,922 $78,200 - - $15,922
-
MMBtu
06 2.1113: Reduce combustion air flow to optimum $29,986 $2,880 - - $29,986
-
MMBtu
07 2.6127: Maintain air filters by cleaning or replacement $1,043 $320 $893
12,581
kWh
$150
-
kW-mo/yr
-
TOTAL RECOMMENDED $135,324 $418,070 $84,969
1,176,753
kWh
$4,447
-
kW-mo/yr
$45,908
-
MMBtu
TOTAL IMPLEMENTED $1,043 $320 $893
12,581
kWh
$150
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs