| Assessment Year | 2024 |
|---|---|
| Principal Product | drawn wire |
| NAICS | 331222: Steel Wire Drawing |
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $100 M to 500M |
| # of Employees | 149 |
| Plant Area |
330,000
ft2
|
| Annual Production | 140,714
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,988,745 | 27,990,800 |
kWh
|
$0.071 | |
| Electricity Demand | $647,925 | 74,664 |
kW-mo/yr
|
$8.68 | |
| Natural Gas | $1,940,353 | 469,012 |
MMBtu
|
$4.14 | |
| Waste Disposal Costs | |||||
| Water Usage | $155,211 | 37,169 |
Tgal
|
$4.18 | |
| Water Disposal | $73,153 | 37,169 |
Tgal
|
$1.97 | |
| TOTAL YEARLY COSTS | $4,805,387 | ||||
| RECOMMENDED SAVINGS* | $135,324 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $1,043 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $60,563 | $285,000 |
$60,563
833,009
kWh
|
- | - | |
| 02 | 2.7263: Lower compressor pressure through a/c system modification | $9,825 | $7,940 |
$9,825
138,378
kWh
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $860 | $750 |
$860
12,110
kWh
|
- | - | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $17,125 | $42,980 |
$12,828
180,675
kWh
|
$4,297
-
kW-mo/yr
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $15,922 | $78,200 | - | - |
$15,922
-
MMBtu
|
|
| 06 | 2.1113: Reduce combustion air flow to optimum | $29,986 | $2,880 | - | - |
$29,986
-
MMBtu
|
|
| 07 | 2.6127: Maintain air filters by cleaning or replacement | $1,043 | $320 |
$893
12,581
kWh
|
$150
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $135,324 | $418,070 |
$84,969
1,176,753
kWh
|
$4,447
-
kW-mo/yr
|
$45,908
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,043 | $320 |
$893
12,581
kWh
|
$150
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs