Assessment Year | 2011 |
---|---|
Principal Product | Beverage Alcohol |
NAICS | 312140: Distilleries |
SIC | 2085: Distilled and Blended Liquors |
Sales Range | greater than $500 M |
# of Employees | 370 |
Plant Area |
1,000,000
ft2
|
Annual Production | 23,772
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,958,100 | 38,838,000 |
kWh
|
$0.050 |
Electricity Demand | $978,432 | 72,073 |
kW-mo/yr
|
$13.58 |
Electricity Fees | $47,830 | - |
|
- |
Natural Gas | $198,719 | 31,795 |
MMBtu
|
$6.25 |
Wood | $2,728,028 | 1,032,051 |
MMBtu
|
$2.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $413,458 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $100,466 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $89,000 | $24,500 | - | - |
$89,000
-
MMBtu
|
|
02 | 2.3321: Use steam pressure reduction to generate power | $204,112 | $553,850 |
$212,025
3,723,000
kWh
|
$63,087
-
kW-mo/yr
|
$(-71,000.0)
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,218 | $44,000 |
$11,507
202,062
kWh
|
$6,711
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,662 | $5 |
$1,662
22,490
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58,700 | $103,900 |
$42,030
737,950
kWh
|
$16,670
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,694 | $70,320 |
$26,150
459,300
kWh
|
$8,544
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,492 | $8,160 |
$1,880
33,050
kWh
|
$612
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,580 | $22,680 |
$3,290
57,800
kWh
|
$1,290
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $413,458 | $827,415 |
$298,544
5,235,652
kWh
|
$96,914
-
kW-mo/yr
|
$18,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $100,466 | $205,060 |
$73,350
1,288,100
kWh
|
$27,116
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs