ITAC Assessment: MZ0351
ITAC logo
ITAC Assessment: MZ0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product rice cakes and chips
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $100
M
to 500
M
# of Employees 306
Plant Area 130,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,064
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,072,908 20,963,716
kWh
Electricity Demand $772,505 37,129
kW-mo/yr
Natural Gas $528,943 69,386
MMBtu
Waste Disposal Costs
Water Usage $58,695 11,647
Tgal
Water Disposal $175,107 11,647
Tgal
TOTAL YEARLY COSTS $2,608,158
RECOMMENDED SAVINGS* $200,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $14,579 $16,300 $14,579
285,942
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $9,533 $640 $9,533
186,959
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $9,603 $3,000 $9,603
188,304
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,137 $23,955 $49,137
963,466
kWh
- -
05 2.2437: Recover waste heat from equipment $72,794 $24,018 - - $72,794
-
MMBtu
06 2.7221: Lower temperature during the winter season and vice-versa $1,304 - $236
4,628
kWh
$629
-
kW-mo/yr
$439
-
MMBtu
07 2.2511: Insulate bare equipment $1,019 $814 - - $1,019
-
MMBtu
08 2.5195: Change product design to reduce energy requirements $42,244 $83,200 $26,262
514,944
kWh
$15,982
-
kW-mo/yr
-
TOTAL RECOMMENDED $200,213 $151,927 $109,350
2,144,243
kWh
$16,611
-
kW-mo/yr
$74,252
-
MMBtu
TOTAL IMPLEMENTED $9,603 $3,000 $9,603
188,304
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs