ITAC Assessment: MZ0343
ITAC logo
ITAC Assessment: MZ0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Rubber belts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 360
Plant Area 649,000
ft2
Annual Production 3,146,339
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,126,583 18,363,513
kWh
Electricity Demand $494,632 37,450
kW-mo/yr
Natural Gas $1,730,653 247,175
MMBtu
TOTAL YEARLY COSTS $3,351,868
RECOMMENDED SAVINGS* $397,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4323: Use optimum size and capacity equipment $4,951 $31,059 $3,675
60,249
kWh
$1,276
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,711 $360 $1,711
28,035
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $5,510 $9,100 $4,090
67,047
kWh
$1,420
-
kW-mo/yr
- -
04 2.2135: Repair and eliminate steam leaks $8,146 $1,330 - - $8,146
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $12,303 $5,150 $11,944
195,783
kWh
$359
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,575 $28,807 $9,575
156,987
kWh
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $52,726 $2,400 - - $52,726
-
MMBtu
-
08 2.3212: Optimize plant power factor $126,570 $196,842 - $100,305
-
kW-mo/yr
- $26,265
09 2.9114: Use solar heat to make electricty $175,679 $545,812 $77,669
1,273,259
kWh
$98,010
-
kW-mo/yr
- -
TOTAL RECOMMENDED $397,171 $820,860 $108,664
1,781,360
kWh
$201,370
-
kW-mo/yr
$60,872
-
MMBtu
$26,265
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs