ITAC Assessment: MZ0324
ITAC logo
ITAC Assessment: MZ0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Auto door panels, Consoles
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 489
Plant Area 332,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $507,438 6,458,949
kWh
Electricity Demand $167,516 39,276
kW-mo/yr
Natural Gas $141,792 7,465
MMBtu
Waste Disposal Costs
Water Usage $6,842 1,095
Tgal
TOTAL YEARLY COSTS $823,588
RECOMMENDED SAVINGS* $95,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $1,260 $480 $1,155
14,623
kWh
$105
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $5,050 $7,800 $4,539
57,451
kWh
$511
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $269 $340 $269
3,406
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $12,278 $240 - - $12,278
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,182 $17,137 $10,411
131,783
kWh
$771
-
kW-mo/yr
-
06 2.9114: Use solar heat to make electricty $65,010 $664,200 $60,506
765,904
kWh
$4,504
-
kW-mo/yr
-
TOTAL RECOMMENDED $95,049 $690,197 $76,880
973,167
kWh
$5,891
-
kW-mo/yr
$12,278
-
MMBtu
TOTAL IMPLEMENTED $18,857 $8,860 $5,963
75,480
kWh
$616
-
kW-mo/yr
$12,278
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs