ITAC Assessment: BD0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Metal storage Buildings
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 300,000
ft2
Annual Production 450,000
units
Production Hrs. Annual 4,320
hrs
Location (State) not found

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,140 3,521,395
kWh
Electricity Fees $11,089 -
Natural Gas $65,693 15,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,501 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,555 $13,420 $7,555
117,819
kWh
- - - - -
02 2.7135: Install occupancy sensors $3,918 $930 $3,918
60,961
kWh
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $3,648 $1,125 $3,648
53,634
kWh
- - - - -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $826 - $826
12,896
kWh
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $245 $235 $149
2,345
kWh
- - - $56 $40
06 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste $1,494 $4,825 - $1,494
-
Tgal
- - - -
07 3.7211: Modify material application methods $1,171 $1,500 - - $1,171
-
gal
- - -
08 4.447: Automate payroll system $7,644 $7,000 - - - $7,644 - -
TOTAL RECOMMENDED $26,501 $29,035 $16,096
247,655
kWh
$1,494
-
Tgal
$1,171
-
gal
$7,644 $56 $40
TOTAL IMPLEMENTED $17,118 $16,975 $15,947
245,310
kWh
- $1,171
-
gal
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs