ITAC Assessment: MZ0301
ITAC logo
ITAC Assessment: MZ0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product wood based glass windows
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 454
Plant Area 341,000
ft2
Annual Production 1,250,280
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,031 3,870,720
kWh
Electricity Demand $35,488 11,301
kW-mo/yr
LPG $74,108 10,149
MMBtu
TOTAL YEARLY COSTS $359,627
RECOMMENDED SAVINGS* $20,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,251 $400 $1,972
30,819
kWh
$279
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,114 $4,500 $1,129
17,472
kWh
$158
-
kW-mo/yr
- $827
03 2.4239: Eliminate or reduce compressed air usage $4,820 $7,000 $4,225
65,707
kWh
$595
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $3,146 $7,360 $1,904
30,845
kWh
$1,242
-
kW-mo/yr
- -
05 2.2425: Use flue gases to heat process or service water $2,963 $4,300 - - $2,963
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $1,087 $5,000 $953
14,756
kWh
$134
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $604 $200 $604
9,351
kWh
- - -
08 2.6127: Maintain air filters by cleaning or replacement $304 $52 $304
4,702
kWh
- - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $673 $405 $589
9,209
kWh
$84
-
kW-mo/yr
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,307 $4,100 $1,307
20,110
kWh
- - -
11 2.7135: Install occupancy sensors $1,132 $1,720 $1,132
17,422
kWh
- - -
TOTAL RECOMMENDED $20,401 $35,037 $14,119
220,393
kWh
$2,492
-
kW-mo/yr
$2,963
-
MMBtu
$827
TOTAL IMPLEMENTED $10,909 $21,257 $9,111
141,307
kWh
$971
-
kW-mo/yr
- $827
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs