ITAC Assessment: MZ0296
ITAC logo
ITAC Assessment: MZ0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product small metal couplings
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 336
Plant Area 125,000
ft2
Annual Production 63,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $688,819 9,560,784
kWh
Natural Gas $79,533 38,512
MMBtu
Waste Disposal Costs
Water Usage $127,681 13,562
Tgal
TOTAL YEARLY COSTS $896,033
RECOMMENDED SAVINGS* $168,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $924 $1,200 $924
12,960
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $669 $200 $669
9,374
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $2,596 $6,400 $2,596
37,235
kWh
- -
04 2.6127: Maintain air filters by cleaning or replacement $1,669 $288 $1,669
21,402
kWh
- -
05 2.2441: Preheat boiler makeup water with waste process heat $3,506 $8,000 - $3,506
-
MMBtu
-
06 4.132: Purchase new equipment to reduce material use / cost $100,865 $197,145 $(-2,506.0)
(-35,100)
kWh
- $103,371
07 4.132: Purchase new equipment to reduce material use / cost $57,876 $199,418 $(-2,034.0)
(-29,700)
kWh
- $59,910
08 2.7135: Install occupancy sensors $336 $360 $336
4,717
kWh
- -
TOTAL RECOMMENDED $168,441 $413,011 $1,654
20,888
kWh
$3,506
-
MMBtu
$163,281
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs