ITAC Assessment: AS0297
ITAC logo
ITAC Assessment: AS0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum die casting
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 87
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,244 2,105,600
kWh
Electricity Demand $34,676 4,661
kW-mo/yr
Electricity Fees $15,473 -
Natural Gas $159,958 27,248
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $203,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings By-product Production Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $166,920 $35,000 n/a $132,244
2,105,600
kWh
$34,676
-
kW-mo/yr
- - -
02 2.7145: Install skylights $1,527 $3,086 $1,527
32,498
kWh
- - - -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $520 $240 $520
7,656
kWh
- - - -
04 2.2414: Use waste heat from hot flue gases to preheat $25,657 $90,000 n/a - - $25,657
-
MMBtu
- -
05 3.5316: Contract a wood pallet recycling company $3,360 $60 - - - - $3,360
06 4.431: Train operators for maximum operating efficiency $5,712 $5,916 - - - $5,712 -
TOTAL RECOMMENDED $203,696 $134,302 $134,291
2,145,754
kWh
$34,676
-
kW-mo/yr
$25,657
-
MMBtu
$5,712 $3,360
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs