| Assessment Year | 2001 |
|---|---|
| Principal Product | Aluminum die casting |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 87 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,244 | 2,105,600 |
kWh
|
$0.063 |
| Electricity Demand | $34,676 | 4,661 |
kW-mo/yr
|
$7.44 |
| Electricity Fees | $15,473 | - |
|
- |
| Natural Gas | $159,958 | 27,248 |
MMBtu
|
$5.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $203,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $166,920 | $35,000 | n/a |
$132,244
2,105,600
kWh
|
$34,676
-
kW-mo/yr
|
- | - | - |
| 02 | 2.7145: Install skylights | $1,527 | $3,086 |
$1,527
32,498
kWh
|
- | - | - | - | |
| 03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $520 | $240 |
$520
7,656
kWh
|
- | - | - | - | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $25,657 | $90,000 | n/a | - | - |
$25,657
-
MMBtu
|
- | - |
| 05 | 3.5316: Contract a wood pallet recycling company | $3,360 | $60 | - | - | - | - | $3,360 | |
| 06 | 4.431: Train operators for maximum operating efficiency | $5,712 | $5,916 | - | - | - | $5,712 | - | |
| TOTAL RECOMMENDED | $203,696 | $134,302 |
$134,291
2,145,754
kWh
|
$34,676
-
kW-mo/yr
|
$25,657
-
MMBtu
|
$5,712 | $3,360 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs