ITAC Assessment: MS0068
ITAC logo
ITAC Assessment: MS0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Steel Containers
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 150,000
ft2
Annual Production 944,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,960 2,555,686
kWh
Electricity Demand $23,990 8,939
kW-mo/yr
Electricity Fees $3,994 -
Natural Gas $117,641 31,460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,503 $11,651 $2,925
55,979
kWh
$578
-
kW-mo/yr
- - -
02 2.4314: Use synthetic lubricant $2,812 $610 $2,351
44,842
kWh
$461
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $44,129 $12,825 - - $44,129
-
MMBtu
- -
04 3.8142: Distill contaminated solvents for reuse $19,799 $15,000 $(-782.0)
(-12,603)
kWh
- - $21,601
-
gal
$(-1,020.0)
TOTAL RECOMMENDED $70,243 $40,086 $4,494
88,218
kWh
$1,039
-
kW-mo/yr
$44,129
-
MMBtu
$21,601
-
gal
$(-1,020.0)
TOTAL IMPLEMENTED $2,812 $610 $2,351
44,842
kWh
$461
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs