Assessment Year | 2020 |
---|---|
Principal Product | Vinyl Dipped Molding |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 115 |
Plant Area |
120,000
ft2
|
Annual Production | 486,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $140,080 | 1,688,136 |
kWh
|
$0.083 | |
Electricity Demand | $23,156 | 5,688 |
kW-mo/yr
|
$4.07 | |
Electricity Fees | $1,272 | - |
|
- | |
Natural Gas | $183,881 | 27,548 |
MMBtu
|
$6.67 | |
Waste Disposal Costs | |||||
Water Usage | $1,914 | 288 |
Tgal
|
$6.65 | |
TOTAL YEARLY COSTS | $350,303 | ||||
RECOMMENDED SAVINGS* | $19,930 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,033 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $4,779 | $20,692 | - | - |
$4,779
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,636 | $1,117 |
$3,542
42,686
kWh
|
$334
-
kW-mo/yr
|
- | $(-240.0) | |
03 | 2.2515: Use optimum thickness insulation | $3,128 | $4,056 |
$2,858
34,438
kWh
|
$270
-
kW-mo/yr
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,651 | $3,250 | - |
$2,651
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $2,151 | $7,144 |
$1,965
23,684
kWh
|
$186
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,118 | $270 |
$1,936
23,327
kWh
|
$182
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,467 | $1,422 |
$1,341
16,159
kWh
|
$126
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $19,930 | $37,951 |
$11,642
140,294
kWh
|
$3,749
-
kW-mo/yr
|
$4,779
-
MMBtu
|
$(-240.0) | ||
TOTAL IMPLEMENTED | $11,033 | $12,587 |
$10,301
124,135
kWh
|
$972
-
kW-mo/yr
|
- | $(-240.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs