Assessment Year | 2020 |
---|---|
Principal Product | Food serving and holding equipment |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3556: Food Products Machinery |
Sales Range | $100 M to 500M |
# of Employees | 375 |
Plant Area |
500,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $417,486 | 7,288,804 |
kWh
|
$0.057 | |
Electricity Demand | $169,236 | 14,189 |
kW-mo/yr
|
$11.93 | |
Natural Gas | $74,003 | 17,829 |
MMBtu
|
$4.15 | |
Waste Disposal Costs | |||||
Water Usage | $6,244 | 1,552 |
Tgal
|
$4.02 | |
Water Disposal | $9,316 | 1,552 |
Tgal
|
$6.00 | |
TOTAL YEARLY COSTS | $676,285 | ||||
RECOMMENDED SAVINGS* | $48,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $27,594 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $2,656 | $8,200 |
$1,475
25,877
kWh
|
$1,181
-
kW-mo/yr
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,624 | $9,088 | - | - |
$4,624
-
MMBtu
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,749 | $480 | - | - |
$2,749
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,970 | $2,000 |
$17,852
313,195
kWh
|
$5,118
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,616 | $13,442 |
$7,790
136,668
kWh
|
$4,016
-
kW-mo/yr
|
- | $3,810 | |
06 | 2.7135: Install occupancy sensors | $118 | $200 |
$118
2,074
kWh
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $238 | $40 |
$168
2,940
kWh
|
$70
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $48,971 | $33,450 |
$27,403
480,754
kWh
|
$10,385
-
kW-mo/yr
|
$7,373
-
MMBtu
|
$3,810 | ||
TOTAL IMPLEMENTED | $27,594 | $11,088 |
$17,852
313,195
kWh
|
$5,118
-
kW-mo/yr
|
$4,624
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs