ITAC Assessment: MZ0276
ITAC logo
ITAC Assessment: MZ0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Assemble machines with fixtures and tooling for automated welding applic
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 128
Plant Area 128,575
ft2
Annual Production 772
units
Production Hrs. Annual 3,636
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,872 1,087,200
kWh
Electricity Demand $13,716 4,077
kW-mo/yr
Natural Gas $15,180 2,065
MMBtu
TOTAL YEARLY COSTS $122,767
RECOMMENDED SAVINGS* $47,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $155 $60 $137
1,592
kWh
$18
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $249 $1,040 $221
2,577
kWh
$28
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $2,641 $180 $2,271
26,408
kWh
$370
-
kW-mo/yr
-
04 2.2622: Replace existing chiller with high efficiency model $44,070 $184,040 $35,734
316,224
kWh
$2,333
-
kW-mo/yr
$6,003
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $367 $120 $367
4,270
kWh
- -
06 2.7135: Install occupancy sensors $191 $390 $191
2,225
kWh
- -
TOTAL RECOMMENDED $47,673 $185,830 $38,921
353,296
kWh
$2,749
-
kW-mo/yr
$6,003
-
MMBtu
TOTAL IMPLEMENTED $47,673 $185,830 $38,921
353,296
kWh
$2,749
-
kW-mo/yr
$6,003
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs