ITAC Assessment: MZ0274
ITAC logo
ITAC Assessment: MZ0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product School/Commercial Bus
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 270,000
ft2
Annual Production 2,500
units
Production Hrs. Annual 2,080
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,147 2,649,719
kWh
Electricity Demand $207,937 10,086
kW-mo/yr
Electricity Fees $3,122 -
Natural Gas $87,373 17,604
MMBtu
TOTAL YEARLY COSTS $428,579
RECOMMENDED SAVINGS* $85,923 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $48,654 $104,076 $12,431
298,114
kWh
$36,223
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $11,093 $7,580 $2,795
67,037
kWh
$8,298
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $9,193 $4,500 $2,348
56,302
kWh
$6,845
-
kW-mo/yr
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,887 $3,200 - $8,887
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,363 $2,480 $1,730
41,492
kWh
$5,033
-
kW-mo/yr
$(-2,400.0)
06 2.6218: Turn off equipment when not in use $1,585 $3,900 $1,585
38,017
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $763 $400 $194
4,660
kWh
$569
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $705 $1,100 $178
4,262
kWh
$527
-
kW-mo/yr
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $680 $100 $175
4,191
kWh
$505
-
kW-mo/yr
-
TOTAL RECOMMENDED $85,923 $127,336 $21,436
514,075
kWh
$66,887
-
kW-mo/yr
$(-2,400.0)
TOTAL IMPLEMENTED $64,500 $116,056 $18,272
438,187
kWh
$48,628
-
kW-mo/yr
$(-2,400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs