ITAC Assessment: MZ0273
ITAC logo
ITAC Assessment: MZ0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Cabinetry
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 700
Plant Area 400,000
ft2
Annual Production 312,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,850 5,999,887
kWh
Electricity Demand $331,110 17,216
kW-mo/yr
Electricity Fees $6,596 -
Natural Gas $154,499 35,622
MMBtu
TOTAL YEARLY COSTS $752,055
RECOMMENDED SAVINGS* $58,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.6125: Sell combustible waste $16,000 $440 - - $16,000
-
lb
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,986 $1,880 $5,048
123,948
kWh
$7,418
-
kW-mo/yr
- $(-480.0)
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,770 $3,200 - $9,770
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,520 $7,260 $3,044
74,746
kWh
$4,476
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $3,687 $1,800 $3,687
90,541
kWh
- - -
06 2.7135: Install occupancy sensors $2,794 $630 $1,132
27,803
kWh
$1,662
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,776 $3,070 $1,125
27,622
kWh
$1,651
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $2,304 $390 $936
22,981
kWh
$1,368
-
kW-mo/yr
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,353 $80 $548
13,463
kWh
$805
-
kW-mo/yr
- -
TOTAL RECOMMENDED $58,190 $18,750 $15,520
381,104
kWh
$27,150
-
kW-mo/yr
$16,000
-
lb
$(-480.0)
TOTAL IMPLEMENTED $34,670 $11,050 $12,476
306,358
kWh
$22,674
-
kW-mo/yr
- $(-480.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs