ITAC Assessment: MZ0271
ITAC logo
ITAC Assessment: MZ0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product recycled glass
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 22,620
ft2
Annual Production 39,890
ton
Production Hrs. Annual 6,528
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,353 925,682
kWh
Electricity Demand $21,967 3,419
kW-mo/yr
Natural Gas $27,200 3,636
MMBtu
Waste Disposal Costs
Water Usage $6,938 284,988
Tgal
TOTAL YEARLY COSTS $161,458
RECOMMENDED SAVINGS* $15,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,858 $5,781 $7,747
67,957
kWh
$803
-
kW-mo/yr
$308
02 2.7135: Install occupancy sensors $4,334 $980 $4,334
38,020
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $586 $360 $507
4,448
kWh
$79
-
kW-mo/yr
-
04 2.4227: Use compressor air filters $764 $150 $764
6,703
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,365 $6,600 $1,181
10,360
kWh
$184
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,907 $13,871 $14,533
127,488
kWh
$1,066
-
kW-mo/yr
$308
TOTAL IMPLEMENTED $5,098 $1,130 $5,098
44,723
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs