ITAC Assessment: MZ0269
ITAC logo
ITAC Assessment: MZ0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product carbon steel tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $50
M
to 100
M
# of Employees 62
Plant Area 210,000
ft2
Annual Production 72,000
ton
Production Hrs. Annual 5,856
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,801 6,132,517
kWh
Electricity Demand $53,701 20,472
kW-mo/yr
Natural Gas $87,940 8,149
MMBtu
Waste Disposal Costs
Water Usage $13,689 4,939,630
Tgal
Water Disposal $24,721 4,940
Tgal
TOTAL YEARLY COSTS $615,851
RECOMMENDED SAVINGS* $21,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,409 $250 $2,240
31,550
kWh
$169
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,423 $6,600 $1,323
18,637
kWh
$100
-
kW-mo/yr
-
03 3.4116: Meter recycled water (to reduce sewer charges) $17,310 $10,400 - - $17,310
-
Tgal
TOTAL RECOMMENDED $21,142 $17,250 $3,563
50,187
kWh
$269
-
kW-mo/yr
$17,310
-
Tgal
TOTAL IMPLEMENTED $3,832 $6,850 $3,563
50,187
kWh
$269
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs