| Assessment Year | 2019 |
|---|---|
| Principal Product | carbon steel tubing |
| NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $50 M to 100M |
| # of Employees | 62 |
| Plant Area |
210,000
ft2
|
| Annual Production | 72,000
ton
|
| Production Hrs. Annual | 5,856
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $435,801 | 6,132,517 |
kWh
|
$0.071 | |
| Electricity Demand | $53,701 | 20,472 |
kW-mo/yr
|
$2.62 | |
| Natural Gas | $87,940 | 8,149 |
MMBtu
|
$10.79 | |
| Waste Disposal Costs | |||||
| Water Usage | $13,689 | 4,939,630 |
Tgal
|
$0.003 | |
| Water Disposal | $24,721 | 4,940 |
Tgal
|
$5.00 | |
| TOTAL YEARLY COSTS | $615,851 | ||||
| RECOMMENDED SAVINGS* | $21,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $3,832 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,409 | $250 |
$2,240
31,550
kWh
|
$169
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $1,423 | $6,600 |
$1,323
18,637
kWh
|
$100
-
kW-mo/yr
|
- | |
| 03 | 3.4116: Meter recycled water (to reduce sewer charges) | $17,310 | $10,400 | - | - |
$17,310
-
Tgal
|
|
| TOTAL RECOMMENDED | $21,142 | $17,250 |
$3,563
50,187
kWh
|
$269
-
kW-mo/yr
|
$17,310
-
Tgal
|
||
| TOTAL IMPLEMENTED | $3,832 | $6,850 |
$3,563
50,187
kWh
|
$269
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs