ITAC Assessment: MZ0258
ITAC logo
ITAC Assessment: MZ0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Acoustic, Structural and Scaling Material Solutions
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $50
M
to 100
M
# of Employees 208
Plant Area 90,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $786,429 10,435,500
kWh
Electricity Demand $214,948 22,500
kW-mo/yr
Electricity Fees $134,502 -
Natural Gas $127,960 18,699
MMBtu
TOTAL YEARLY COSTS $1,263,839
RECOMMENDED SAVINGS* $69,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,522

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $19,136 $1,400 $19,136
253,789
kWh
- - - -
02 2.8121: Apply for tax-free status for energy purchases $17,450 $5,000 - - $17,450 - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,883 $6,200 $7,887
104,597
kWh
$1,996
-
kW-mo/yr
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,728 $3,200 - $7,728
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $5,199 $420 $4,148
55,106
kWh
$1,051
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,344 $1,800 $4,583
60,784
kWh
$1,161
-
kW-mo/yr
- - $(-400.0)
07 2.2515: Use optimum thickness insulation $4,597 $2,989 - - - $4,597
-
MMBtu
-
TOTAL RECOMMENDED $69,337 $21,009 $35,754
474,276
kWh
$11,936
-
kW-mo/yr
$17,450 $4,597
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $30,522 $10,000 $4,583
60,784
kWh
$8,889
-
kW-mo/yr
$17,450 - $(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings