ITAC Assessment: MS0303
ITAC logo
ITAC Assessment: MS0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Frozen Food
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 335,000
ft2
Annual Production 7,181,818
units
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $793,302 11,065,927
kWh
Electricity Demand $83,780 20,160
kW-mo/yr
Electricity Fees $40,220 -
Natural Gas $23,429 1,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $42,224 $161,070 $37,029
361,596
kWh
$2,433
-
kW-mo/yr
$2,762 -
02 2.2447: Heat water with exhaust heat $9,180 $27,946 - - - $9,180
-
MMBtu
03 3.6124: Burn waste oil for heat $3,804 $2,186 - - - $3,804
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,457 $1,500 $1,275
12,447
kWh
$88
-
kW-mo/yr
$94 -
TOTAL RECOMMENDED $56,665 $192,702 $38,304
374,043
kWh
$2,521
-
kW-mo/yr
$2,856 $12,984
-
MMBtu
TOTAL IMPLEMENTED $47,485 $164,756 $38,304
374,043
kWh
$2,521
-
kW-mo/yr
$2,856 $3,804
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs