ITAC Assessment: MA0539
ITAC logo
ITAC Assessment: MA0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Chemicals
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 69
Plant Area 95,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 2,300
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,053 577,120
kWh
Electricity Demand $15,242 1,981
kW-mo/yr
Electricity Fees $3,084 -
LPG $5,882 300
MMBtu
Fuel Oil #2 $44,345 6,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,441

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Liquid (haz) Savings
01 3.3131: Use evaporation to concentrate material $13,787 $12,870 - $(-6,613.0)
-
MMBtu
$20,400
-
gal
02 2.7261: Install timers and/or thermostats $5,957 $650 $1,791
40,700
kWh
$4,166
-
MMBtu
-
03 2.7314: Reduce ventilation air $301 $800 - $301
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $183 - $183
3,000
kWh
- -
05 2.2511: Insulate bare equipment $63 $93 - $63
-
MMBtu
-
TOTAL RECOMMENDED $20,291 $14,413 $1,974
43,700
kWh
$(-2,083.0)
-
MMBtu
$20,400
-
gal
TOTAL IMPLEMENTED $6,441 $1,450 $1,974
43,700
kWh
$4,467
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs