ITAC Assessment: MZ0251
ITAC logo
ITAC Assessment: MZ0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product chimey covers
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 122,300
ft2
Annual Production 440,000
pieces
Production Hrs. Annual 2,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,041 861,547
kWh
Electricity Demand $12,631 4,418
kW-mo/yr
Natural Gas $66,949 7,918
MMBtu
Waste Disposal Costs
Water Usage $18,239 3,839,301
Tgal
TOTAL YEARLY COSTS $166,859
RECOMMENDED SAVINGS* $41,976 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $22,536 $32,400 $(-387.0)
(-4,841)
kWh
$(-77.0)
-
kW-mo/yr
- $1,350
-
Tgal
$21,650
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $688 $75 $571
7,139
kWh
$117
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $862 $1,160 $689
8,618
kWh
$173
-
kW-mo/yr
- - -
04 2.1321: Replace fossil fuel equipment with electrical equipment $6,719 $36,000 $(-6,480.0)
(-81,000)
kWh
$(-2,059.0)
-
kW-mo/yr
$15,258
-
MMBtu
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,018 - $851
10,635
kWh
$167
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $10,153 $6,140 $5,563
69,541
kWh
$4,590
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $41,976 $75,775 $807
10,092
kWh
$2,911
-
kW-mo/yr
$15,258
-
MMBtu
$1,350
-
Tgal
$21,650
TOTAL IMPLEMENTED $12,721 $7,375 $7,674
95,933
kWh
$5,047
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs