ITAC Assessment: MI0315
ITAC logo
ITAC Assessment: MI0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Surgical Scapels
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 84,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,037,108 6,931,663
kWh
Electricity Demand $105,505 12,993
kW-mo/yr
Fuel Oil #6 $48,000 3,600
MMBtu
TOTAL YEARLY COSTS $1,190,613
RECOMMENDED SAVINGS* $164,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $130,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $60,269 $1,660 $57,776
385,170
kWh
$2,493
-
kW-mo/yr
-
02 2.1224: Replace boiler $28,850 $36,000 - - $28,850
-
MMBtu
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $23,532 $1,560 $17,763
118,420
kWh
$5,769
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $18,687 $960 $17,323
115,488
kWh
$1,364
-
kW-mo/yr
-
05 2.2515: Use optimum thickness insulation $10,994 $1,320 $10,192
67,945
kWh
$802
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $9,833 $434 $9,833
65,555
kWh
- -
07 2.7496: Install partitions to reduce size of conditioned space $6,476 $6,800 $6,005
40,036
kWh
$471
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $6,093 $5,340 $6,093
40,623
kWh
- -
TOTAL RECOMMENDED $164,734 $54,074 $124,985
833,237
kWh
$10,899
-
kW-mo/yr
$28,850
-
MMBtu
TOTAL IMPLEMENTED $130,208 $51,194 $97,030
646,872
kWh
$4,328
-
kW-mo/yr
$28,850
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs