Assessment Year | 2017 |
---|---|
Principal Product | Surgical Scapels |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
84,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,037,108 | 6,931,663 |
kWh
|
$0.15 |
Electricity Demand | $105,505 | 12,993 |
kW-mo/yr
|
$8.12 |
Fuel Oil #6 | $48,000 | 3,600 |
MMBtu
|
$13.33 |
TOTAL YEARLY COSTS | $1,190,613 | |||
RECOMMENDED SAVINGS* | $164,734 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $130,208 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $60,269 | $1,660 |
$57,776
385,170
kWh
|
$2,493
-
kW-mo/yr
|
- | |
02 | 2.1224: Replace boiler | $28,850 | $36,000 | - | - |
$28,850
-
MMBtu
|
|
03 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $23,532 | $1,560 |
$17,763
118,420
kWh
|
$5,769
-
kW-mo/yr
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $18,687 | $960 |
$17,323
115,488
kWh
|
$1,364
-
kW-mo/yr
|
- | |
05 | 2.2515: Use optimum thickness insulation | $10,994 | $1,320 |
$10,192
67,945
kWh
|
$802
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $9,833 | $434 |
$9,833
65,555
kWh
|
- | - | |
07 | 2.7496: Install partitions to reduce size of conditioned space | $6,476 | $6,800 |
$6,005
40,036
kWh
|
$471
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,093 | $5,340 |
$6,093
40,623
kWh
|
- | - | |
TOTAL RECOMMENDED | $164,734 | $54,074 |
$124,985
833,237
kWh
|
$10,899
-
kW-mo/yr
|
$28,850
-
MMBtu
|
||
TOTAL IMPLEMENTED | $130,208 | $51,194 |
$97,030
646,872
kWh
|
$4,328
-
kW-mo/yr
|
$28,850
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs