Assessment Year | 2018 |
---|---|
Principal Product | Plastic |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
90,000
ft2
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $318,332 | 6,260,060 |
kWh
|
$0.051 |
Electricity Demand | $304,153 | 17,823 |
kW-mo/yr
|
$17.07 |
Electricity Fees | $15,802 | - |
|
- |
TOTAL YEARLY COSTS | $638,287 | |||
RECOMMENDED SAVINGS* | $63,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,661 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $29,241 | $3,340 | - |
$29,241
-
kW-mo/yr
|
|
02 | 2.3212: Optimize plant power factor | $13,764 | $10,000 | - |
$13,764
-
kW-mo/yr
|
|
03 | 2.7135: Install occupancy sensors | $6,231 | $2,346 |
$6,231
122,407
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,430 | $4,900 |
$2,672
52,495
kWh
|
$1,758
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $3,573 | $500 |
$2,173
42,696
kWh
|
$1,400
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,053 | $170 |
$1,858
36,796
kWh
|
$1,195
-
kW-mo/yr
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $2,794 | $740 |
$1,702
33,444
kWh
|
$1,092
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $63,086 | $21,996 |
$14,636
287,838
kWh
|
$48,450
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $10,661 | $7,246 |
$8,903
174,902
kWh
|
$1,758
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs