ITAC Assessment: MZ0245
ITAC logo
ITAC Assessment: MZ0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Control Cables
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $50
M
to 100
M
# of Employees 178
Plant Area 13,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,251 2,780,736
kWh
Electricity Demand $163,413 9,748
kW-mo/yr
Electricity Fees $9,932 -
Natural Gas $15,774 2,503
MMBtu
TOTAL YEARLY COSTS $332,370
RECOMMENDED SAVINGS* $75,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,959 $47,658 $9,113
176,947
kWh
$9,846
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,450 $2,183 $10,036
194,872
kWh
$4,474
-
kW-mo/yr
- $(-60.0)
03 2.3212: Optimize plant power factor $13,572 $12,250 - $13,572
-
kW-mo/yr
- -
04 2.8121: Apply for tax-free status for energy purchases $7,371 - - - $7,371 -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,041 $3,300 - $6,041
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,755 $150 $2,597
50,536
kWh
$1,158
-
kW-mo/yr
- -
07 2.6218: Turn off equipment when not in use $3,321 $1,300 $3,321
64,489
kWh
- - -
08 2.7135: Install occupancy sensors $3,089 $2,730 $1,191
21,847
kWh
$1,898
-
kW-mo/yr
- -
09 2.4239: Eliminate or reduce compressed air usage $2,202 $500 $1,354
26,296
kWh
$848
-
kW-mo/yr
- -
10 2.7134: Use photocell controls $1,335 $906 $411
7,542
kWh
$924
-
kW-mo/yr
- -
11 2.4221: Install compressor air intakes in coolest locations $1,076 $250 $744
14,447
kWh
$332
-
kW-mo/yr
- -
TOTAL RECOMMENDED $75,171 $71,227 $28,767
556,976
kWh
$39,093
-
kW-mo/yr
$7,371 $(-60.0)
TOTAL IMPLEMENTED $46,852 $54,771 $28,356
549,434
kWh
$18,556
-
kW-mo/yr
- $(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs