ITAC Assessment: MZ0241
ITAC logo
ITAC Assessment: MZ0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product automotive parts and assemblies
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 651
Plant Area 350,000
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 4,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,021,089 10,584,600
kWh
Electricity Demand $117,049 24,540
kW-mo/yr
Natural Gas $65,335 9,602
MMBtu
Waste Disposal Costs
Water Usage $10,725 16,182
Tgal
TOTAL YEARLY COSTS $1,214,197
RECOMMENDED SAVINGS* $209,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $136,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $326 - $326
3,436
kWh
- - -
02 2.2441: Preheat boiler makeup water with waste process heat $1,238 $3,570 - - $1,238
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $2,547 $4,050 - - $2,547
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $3,218 $1,820 $2,822
28,223
kWh
$396
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $34,321 $100,150 $16,678
173,726
kWh
$2,437
-
kW-mo/yr
- $15,206
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,151 $4,125 $381
3,966
kWh
$56
-
kW-mo/yr
- $714
07 2.7135: Install occupancy sensors $658 $700 $658
6,854
kWh
- - -
08 2.9112: Use solar heat to heat water $71,196 $875,000 $62,331
649,277
kWh
$4,207
-
kW-mo/yr
- $4,658
09 2.4133: Use most efficient type of electric motors $1,210 $12,000 $1,061
10,609
kWh
$149
-
kW-mo/yr
- -
10 2.7221: Lower temperature during the winter season and vice-versa $93,474 $93,474 $93,474
973,687
kWh
- - -
TOTAL RECOMMENDED $209,339 $1,094,889 $177,731
1,849,778
kWh
$7,245
-
kW-mo/yr
$3,785
-
MMBtu
$20,578
TOTAL IMPLEMENTED $136,933 $207,889 $114,339
1,189,892
kWh
$2,889
-
kW-mo/yr
$3,785
-
MMBtu
$15,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs