Assessment Year | 2022 |
---|---|
Principal Product | Cables and wires |
NAICS | 335929: Other Communication and Energy Wire Manufacturing |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
680,000
ft2
|
Annual Production | 100,000,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $937,733 | 11,788,800 |
kWh
|
$0.080 | |
Electricity Demand | $460,435 | 24,336 |
kW-mo/yr
|
$18.92 | |
Electricity Fees | $27,326 | - |
|
- | |
Natural Gas | $504,050 | 47,756 |
MMBtu
|
$10.55 | |
Waste Disposal Costs | |||||
Water Usage | $49,343 | 1,072 |
Tgal
|
$46.04 | |
TOTAL YEARLY COSTS | $1,978,886 | ||||
RECOMMENDED SAVINGS* | $897,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $13,662 | $9,582 | - | - |
$13,662
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $4,020 | $7,066 | - | - |
$4,020
-
MMBtu
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $35,091 | $2,940 |
$26,464
332,880
kWh
|
$8,628
-
kW-mo/yr
|
- | - | |
04 | 2.7233: Use properly designed and sized hvac equipment | $22,048 | $108,454 |
$11,082
139,400
kWh
|
$3,613
-
kW-mo/yr
|
- | $7,353 | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,677 | $960 | - | - |
$8,677
-
MMBtu
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $7,588 | $4,500 |
$7,588
95,441
kWh
|
- | - | - | |
07 | 2.9114: Use solar heat to make electricty | $806,860 | $4,875,813 |
$512,640
6,448,296
kWh
|
$376,432
-
kW-mo/yr
|
- | $(-82,212.0) | |
TOTAL RECOMMENDED | $897,946 | $5,009,315 |
$557,774
7,016,017
kWh
|
$388,673
-
kW-mo/yr
|
$26,359
-
MMBtu
|
$(-74,859.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs