Assessment Year | 2017 |
---|---|
Principal Product | Plastic Bottles |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
96,562
ft2
|
Annual Production | 80,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,472 | 4,588,800 |
kWh
|
$0.038 |
Electricity Demand | $274,340 | 12,492 |
kW-mo/yr
|
$21.96 |
Electricity Fees | $1,272 | - |
|
- |
TOTAL YEARLY COSTS | $450,084 | |||
RECOMMENDED SAVINGS* | $50,137 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,977 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $23,631 | $11,250 | - |
$23,631
-
kW-mo/yr
|
- | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $10,618 | $5,000 | - | - | $10,618 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,672 | $13,565 |
$3,158
83,114
kWh
|
$3,514
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,101 | $1,623 |
$1,971
51,857
kWh
|
$2,190
-
kW-mo/yr
|
- | $(-60.0) | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,640 | $1,000 |
$1,250
32,911
kWh
|
$1,390
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $941 | $2,999 |
$238
6,262
kWh
|
$703
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $933 | $300 |
$442
11,619
kWh
|
$491
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $601 | $1,362 |
$381
10,034
kWh
|
$220
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $50,137 | $37,099 |
$7,440
195,797
kWh
|
$32,139
-
kW-mo/yr
|
$10,618 | $(-60.0) | ||
TOTAL IMPLEMENTED | $37,977 | $27,738 |
$6,821
179,501
kWh
|
$31,216
-
kW-mo/yr
|
- | $(-60.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs