Assessment Year | 2017 |
---|---|
Principal Product | Rice cake and “Popped Crisps” snacks |
NAICS | 311919: Other Snack Food Manufacturing |
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
112,000
ft2
|
Annual Production | 50,000,000
units
|
Production Hrs. Annual | 8,658
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $695,400 | 12,944,161 |
kWh
|
$0.054 | |
Electricity Demand | $485,876 | 26,983 |
kW-mo/yr
|
$18.01 | |
Natural Gas | $241,003 | 87,319 |
MMBtu
|
$2.76 | |
Waste Disposal Costs | |||||
Water Usage | $55,223 | 7,023,460 |
Tgal
|
$0.008 | |
TOTAL YEARLY COSTS | $1,477,502 | ||||
RECOMMENDED SAVINGS* | $29,366 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $25,201 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,015 | $5,450 |
$699
12,941
kWh
|
$1,316
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,166 | - |
$4,166
77,143
kWh
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $2,988 | $1,115 | - | - |
$2,988
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $11,081 | $4,960 | - | - |
$11,081
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $8,703 | $1,760 |
$5,953
110,242
kWh
|
$2,750
-
kW-mo/yr
|
- | |
06 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $414 | $220 | - | - |
$414
-
MMBtu
|
|
TOTAL RECOMMENDED | $29,366 | $13,505 |
$10,818
200,326
kWh
|
$4,066
-
kW-mo/yr
|
$14,482
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,201 | $13,505 |
$6,652
123,183
kWh
|
$4,066
-
kW-mo/yr
|
$14,482
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs