ITAC Assessment: CL2107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Portable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $500
k
to 1
M
# of Employees 20
Plant Area 10,804
ft2
Annual Production 100,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,249 3,258,400
kWh
Electricity Fees $15,499 -
TOTAL YEARLY COSTS $216,748
RECOMMENDED SAVINGS* $43,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,074 $19,482 $6,074
98,349
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,152 $2,480 $1,152
18,634
kWh
- -
03 4.463: Modify facility to avoid excess maintenance costs $950 $4,500 - - $950
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $35,390 - $1,125
18,218
kWh
$34,265
-
Tgal
-
TOTAL RECOMMENDED $43,566 $26,462 $8,351
135,201
kWh
$34,265
-
Tgal
$950
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs