Assessment Year | 2017 |
---|---|
Principal Product | Aeration water treatment system |
NAICS | 333318: Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
107,900
ft2
|
Annual Production | 950,000
units
|
Production Hrs. Annual | 2,300
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $59,637 | 588,160 |
kWh
|
$0.10 | |
Electricity Demand | $16,800 | 2,279 |
kW-mo/yr
|
$7.37 | |
Natural Gas | $5,722 | 575 |
MMBtu
|
$9.95 | |
Waste Disposal Costs | |||||
Water Usage | $18,989 | 1,704,810 |
Tgal
|
$0.011 | |
TOTAL YEARLY COSTS | $101,148 | ||||
RECOMMENDED SAVINGS* | $4,346 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $4,346 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,645 | $5,229 |
$2,640
26,146
kWh
|
$1,005
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $247 | $260 |
$179
1,771
kWh
|
$68
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $97 | $190 |
$70
697
kWh
|
$27
-
kW-mo/yr
|
- | |
04 | 3.4151: Minimize water usage | $90 | $35 | - | - |
$90
-
Tgal
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $267 | - |
$193
1,911
kWh
|
$74
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $4,346 | $5,714 |
$3,082
30,525
kWh
|
$1,173
-
kW-mo/yr
|
$90
-
Tgal
|
||
TOTAL IMPLEMENTED | $4,346 | $5,714 |
$3,082
30,525
kWh
|
$1,173
-
kW-mo/yr
|
$90
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs