ITAC Assessment: MZ0222
ITAC logo
ITAC Assessment: MZ0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aeration water treatment system
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 107,900
ft2
Annual Production 950,000
units
Production Hrs. Annual 2,300
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,637 588,160
kWh
Electricity Demand $16,800 2,279
kW-mo/yr
Natural Gas $5,722 575
MMBtu
Waste Disposal Costs
Water Usage $18,989 1,704,810
Tgal
TOTAL YEARLY COSTS $101,148
RECOMMENDED SAVINGS* $4,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,645 $5,229 $2,640
26,146
kWh
$1,005
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $247 $260 $179
1,771
kWh
$68
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $97 $190 $70
697
kWh
$27
-
kW-mo/yr
-
04 3.4151: Minimize water usage $90 $35 - - $90
-
Tgal
05 2.4231: Reduce the pressure of compressed air to the minimum required $267 - $193
1,911
kWh
$74
-
kW-mo/yr
-
TOTAL RECOMMENDED $4,346 $5,714 $3,082
30,525
kWh
$1,173
-
kW-mo/yr
$90
-
Tgal
TOTAL IMPLEMENTED $4,346 $5,714 $3,082
30,525
kWh
$1,173
-
kW-mo/yr
$90
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs