ITAC Assessment: MZ0220
ITAC logo
ITAC Assessment: MZ0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product plastic parts for automobiles, also appliances
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 136,000
ft2
Annual Production 950,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,115 4,344,918
kWh
Electricity Demand $212,667 10,337
kW-mo/yr
TOTAL YEARLY COSTS $425,782
RECOMMENDED SAVINGS* $13,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $2,360 $2,860 $2,206
45,024
kWh
$154
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,030 $11,846 $1,104
22,536
kWh
$926
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,483 $6,643 $1,261
25,728
kWh
$2,222
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $2,435 $1,320 $1,149
23,452
kWh
$1,286
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,522 $1,000 $1,897
38,708
kWh
$1,625
-
kW-mo/yr
TOTAL RECOMMENDED $13,830 $23,669 $7,617
155,448
kWh
$6,213
-
kW-mo/yr
TOTAL IMPLEMENTED $13,830 $23,669 $7,617
155,448
kWh
$6,213
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs