ITAC Assessment: MZ0214
ITAC logo
ITAC Assessment: MZ0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product industrial fan
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 160,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,418 1,981,700
kWh
Electricity Demand $69,666 6,215
kW-mo/yr
Natural Gas $22,279 2,739
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,602

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,834 $28,800 $9,631
136,800
kWh
$9,203
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $3,444 $2,000 $1,762
25,026
kWh
$1,682
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,540 $860 $789
11,209
kWh
$751
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $1,228 $1,100 - - $1,228
-
MMBtu
05 2.7135: Install occupancy sensors $2,958 $1,650 $2,958
42,010
kWh
- -
TOTAL RECOMMENDED $28,004 $34,410 $15,140
215,045
kWh
$11,636
-
kW-mo/yr
$1,228
-
MMBtu
TOTAL IMPLEMENTED $21,602 $30,760 $10,420
148,009
kWh
$9,954
-
kW-mo/yr
$1,228
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs