Assessment Year | 2016 |
---|---|
Principal Product | industrial fan |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
160,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,418 | 1,981,700 |
kWh
|
$0.070 |
Electricity Demand | $69,666 | 6,215 |
kW-mo/yr
|
$11.21 |
Natural Gas | $22,279 | 2,739 |
MMBtu
|
$8.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,602 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,834 | $28,800 |
$9,631
136,800
kWh
|
$9,203
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,444 | $2,000 |
$1,762
25,026
kWh
|
$1,682
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,540 | $860 |
$789
11,209
kWh
|
$751
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $1,228 | $1,100 | - | - |
$1,228
-
MMBtu
|
|
05 | 2.7135: Install occupancy sensors | $2,958 | $1,650 |
$2,958
42,010
kWh
|
- | - | |
TOTAL RECOMMENDED | $28,004 | $34,410 |
$15,140
215,045
kWh
|
$11,636
-
kW-mo/yr
|
$1,228
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,602 | $30,760 |
$10,420
148,009
kWh
|
$9,954
-
kW-mo/yr
|
$1,228
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs