ITAC Assessment: MZ0207
ITAC logo
ITAC Assessment: MZ0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product food and pharmaceutical equipment
NAICS 333241: Food Product Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 32,500
ft2
Annual Production 500
pieces
Production Hrs. Annual 3,675
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,294 1,069,200
kWh
Electricity Demand $30,752 3,844
kW-mo/yr
Natural Gas $5,252 764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,654

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $8,485 $27,300 $6,901
86,504
kWh
$1,584
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,482 $3,430 $1,114
13,965
kWh
$368
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,538 $880 $1,914
23,989
kWh
$624
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $1,096 $1,500 $824
10,335
kWh
$272
-
kW-mo/yr
05 3.1161: Eliminate/reduce an operation $149 - $109
1,371
kWh
$40
-
kW-mo/yr
TOTAL RECOMMENDED $13,750 $33,110 $10,862
136,164
kWh
$2,888
-
kW-mo/yr
TOTAL IMPLEMENTED $12,654 $31,610 $10,038
125,829
kWh
$2,616
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs