| Assessment Year | 2016 |
|---|---|
| Principal Product | assembly of electroic connectors |
| NAICS | 334419: Other Electronic Component Manufacturing |
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $50 M to 100M |
| # of Employees | 122 |
| Plant Area |
43,000
ft2
|
| Annual Production | 15,000,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $147,934 | 1,585,200 |
kWh
|
$0.093 |
| Electricity Demand | $41,795 | 4,694 |
kW-mo/yr
|
$8.90 |
| Natural Gas | $4,161 | 457 |
MMBtu
|
$9.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,719 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $3,536 | $1,500 |
$3,536
38,020
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,259 | $37,722 |
$7,971
85,712
kWh
|
$2,288
-
kW-mo/yr
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,678 | $1,200 |
$1,678
18,040
kWh
|
- | |
| 04 | 2.6127: Maintain air filters by cleaning or replacement | $266 | - |
$266
2,859
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,246 | $1,212 |
$7,246
80,511
kWh
|
- | |
| TOTAL RECOMMENDED | $22,985 | $41,634 |
$20,697
225,142
kWh
|
$2,288
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $22,719 | $41,634 |
$20,431
222,283
kWh
|
$2,288
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs