ITAC Assessment: MZ0203
ITAC logo
ITAC Assessment: MZ0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product elecroplated electronic connectors
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 65,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,544 1,374,000
kWh
Natural Gas $15,749 2,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,778

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $3,747 $680 $3,747
46,840
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,707 $11,425 $1,707
21,344
kWh
03 2.4223: Install direct acting units in place of compressed air pressure system in safety system $324 $1,975 $324
4,044
kWh
04 2.2622: Replace existing chiller with high efficiency model $6,109 $37,500 $6,109
78,000
kWh
TOTAL RECOMMENDED $11,887 $51,580 $11,887
150,228
kWh
TOTAL IMPLEMENTED $5,778 $14,080 $5,778
72,228
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs