ITAC Assessment: MZ0197
ITAC logo
ITAC Assessment: MZ0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product eletronic connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 166
Plant Area 75,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 4,216
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,504 2,582,400
kWh
Natural Gas $1,630 208
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $5,337 $1,752 $5,337
76,245
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,900 $960 $6,900
98,524
kWh
03 2.4239: Eliminate or reduce compressed air usage $11,344 $3,200 $11,344
162,000
kWh
04 2.4221: Install compressor air intakes in coolest locations $3,362 $1,160 $3,362
48,030
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,151 - $1,151
15,285
kWh
TOTAL RECOMMENDED $28,094 $7,072 $28,094
400,084
kWh
TOTAL IMPLEMENTED $26,943 $7,072 $26,943
384,799
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs