ITAC Assessment: MZ0195
ITAC logo
ITAC Assessment: MZ0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Tires
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 45,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 5,700
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,946 1,285,030
kWh
Electricity Demand $36,732 4,817
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2511: Insulate bare equipment $349 $500 $349
5,157
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,017 $10,320 $4,055
59,936
kWh
$962
-
kW-mo/yr
03 2.7134: Use photocell controls $4,839 $980 $4,839
71,520
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $887 $2,000 $719
10,620
kWh
$168
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,672 $860 $2,161
31,945
kWh
$511
-
kW-mo/yr
TOTAL RECOMMENDED $13,764 $14,660 $12,123
179,178
kWh
$1,641
-
kW-mo/yr
TOTAL IMPLEMENTED $8,038 $11,680 $6,565
97,038
kWh
$1,473
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs