ITAC Assessment: MZ0193
ITAC logo
ITAC Assessment: MZ0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product aluminum die castings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 69
Plant Area 25,000
ft2
Annual Production 5,900,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,911 2,713,280
kWh
Natural Gas $294,611 25,162
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $21,804 $700 - $21,804
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $3,714 $1,160 $3,714
37,512
kWh
-
03 2.2424: Use heat in flue gases to preheat products or materials $62,777 $37,500 - $62,777
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $2,733 $5,660 $2,733
27,331
kWh
-
TOTAL RECOMMENDED $91,028 $45,020 $6,447
64,843
kWh
$84,581
-
MMBtu
TOTAL IMPLEMENTED $88,295 $39,360 $3,714
37,512
kWh
$84,581
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs