ITAC Assessment: MZ0189
ITAC logo
ITAC Assessment: MZ0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Tires
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 162,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 3,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,716 1,481,607
kWh
Electricity Demand $49,063 6,734
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,361 - - $18,361
-
kW-mo/yr
-
02 3.7212: Improved material handling (mixing and transfer) $4,178 $8,000 $3,406
61,700
kWh
$452
-
kW-mo/yr
$320
03 2.4221: Install compressor air intakes in coolest locations $1,216 $2,500 $844
15,187
kWh
$372
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,865 $880 $1,297
23,499
kWh
$568
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $3,835 $5,500 $3,085
55,884
kWh
$750
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $1,139 - $964
17,471
kWh
$175
-
kW-mo/yr
-
TOTAL RECOMMENDED $30,594 $16,880 $9,596
173,741
kWh
$20,678
-
kW-mo/yr
$320
TOTAL IMPLEMENTED $4,220 $3,380 $3,105
56,157
kWh
$1,115
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs