Assessment Year | 2015 |
---|---|
Principal Product | Tires |
NAICS | 326211: Tire Manufacturing (except Retreading) |
SIC | 3011: Tires and Inner Tubes |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
162,000
ft2
|
Annual Production | 250,000
pieces
|
Production Hrs. Annual | 3,600
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,716 | 1,481,607 |
kWh
|
$0.055 |
Electricity Demand | $49,063 | 6,734 |
kW-mo/yr
|
$7.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,594 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,220 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,361 | - | - |
$18,361
-
kW-mo/yr
|
- | |
02 | 3.7212: Improved material handling (mixing and transfer) | $4,178 | $8,000 |
$3,406
61,700
kWh
|
$452
-
kW-mo/yr
|
$320 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,216 | $2,500 |
$844
15,187
kWh
|
$372
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,865 | $880 |
$1,297
23,499
kWh
|
$568
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $3,835 | $5,500 |
$3,085
55,884
kWh
|
$750
-
kW-mo/yr
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,139 | - |
$964
17,471
kWh
|
$175
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $30,594 | $16,880 |
$9,596
173,741
kWh
|
$20,678
-
kW-mo/yr
|
$320 | ||
TOTAL IMPLEMENTED | $4,220 | $3,380 |
$3,105
56,157
kWh
|
$1,115
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs