ITAC Assessment: MZ0181
ITAC logo
ITAC Assessment: MZ0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product containers and fixtures
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 81,750
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 8,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,629 2,028,939
kWh
Electricity Demand $28,590 7,121
kW-mo/yr
Natural Gas $24,094 4,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7442: Keep doors and windows shut when not on use $2,643 $4,000 - - $2,643
-
MMBtu
02 3.1161: Eliminate/reduce an operation $419 - $347
6,480
kWh
$72
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $6,725 $8,000 $6,183
115,481
kWh
$542
-
kW-mo/yr
-
04 2.7111: Reduce illumination to minimum necessary levels $1,719 - $1,554
29,025
kWh
$165
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,506 $12,000 $8,084
150,986
kWh
$779
-
kW-mo/yr
$2,643
-
MMBtu
TOTAL IMPLEMENTED $1,719 - $1,554
29,025
kWh
$165
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs