Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread, tortilla
NAICS 311812: Commercial Bakeries
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,018,768 16,852,369
kWh
Electricity Demand $449,942 33,851
kW-mo/yr
Natural Gas $474,319 83,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7425: Clean or color roof to reduce solar load $8,279 - $6,338
104,835
kWh
$1,941
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $22,758 $100,000 $22,758
376,462
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $16,004 $6,500 $12,242
202,508
kWh
$3,762
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $1,923 $1,000 $1,471
24,335
kWh
$452
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,037 $1,560 $9,980
165,082
kWh
$3,057
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $62,569 $115,650 $47,882
792,060
kWh
$14,687
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $30,675 $7,500 $30,675
507,426
kWh
- -
08 2.1223: Install smaller boiler (increase high fire duty cycle) $2,330 $3,500 - - $2,330
-
MMBtu
09 2.2437: Recover waste heat from equipment $2,580 $9,500 - - $2,580
-
MMBtu
TOTAL RECOMMENDED $160,155 $245,210 $131,346
2,172,708
kWh
$23,899
-
kW-mo/yr
$4,910
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs